Keep going until its done! I found the ornamentador last week and he came up.and took some measurements, we need some secure spaces and also more storage in the new kitchen area.
Well today was a nice morning with no rain and we loaded up the car.
It all fits, as long as you pack it right!
We tied it all down with a long nylon rope, we have a bumpy road ahead of us to get up to the farm. But the Nissan is a beast and will crawl right up the mountain with this load.
We travel up and park at our spot, and start unloading. We pick up a neighbor along the way.
But everybody helps carry the metal bits the rest of the way up! And thank goodness, it was just enough arms to get it all in one trip.
After that, all that remains is the installation!
Above the wash space, we are putting in a cabinet. But, we had to move the light bulb.
Above the refridgerator, an open shelf for putting things.
Underneath the sink, some sliding doors designed with our doggies in mind.
And of course a nice gutter so the rain doesn't splash quite so much.
There is always more to do, but today I feel like great visible progress was made!
Que les rinde!