Hello Friends, today was a very good day. I've been doing bathroom renovations for about a month. Bathroom furniture also arrived today. The bathroom is complete. Let's see what I did for the bathroom. ☺️
Yes, the bathroom has turned into a battlefield as you can see in the picture. 😂 I dismantled all the old furniture in the bathroom. I dismantled the toilet. I replaced the plumbing for the new bathroom. ☺️
After relocating the plumbing, I poured concrete on the floor. I installed the water pipes. I tilted the floor. If you make the floor sloped, the water will go to the drains. An important detail. ☺️
I took out the old bathroom window. Since I can't do the tile work myself, I hired a master. It's not an easy job. It is finished in tiles as you can see in the picture. Now we are ready for the walls. ☺️
I laid a nylon tarp on the floor to prevent the tiles from getting dirty. Since the walls will be plastered on tiles, you need to apply a special liquid. I applied the special mixture on the tiles and waited for it to dry. ☺️
After the special mixture dried, I made the walls with satin plaster. You need to make 3 layers of satin plaster. I waited 3 days for this process. You have to wait for it to dry every day. After the satin plaster dried, I painted it. ☺️
Finally, I installed the shower cabin. Furniture also arrived today and the bathroom is complete. I have a led light project for the mirror. I will do it tomorrow. I ordered the faucet. When it comes to the faucet, the bathroom will be perfect. 😊
All images taken by @crysis
For the best experience view this post on Liketu