Doing yield test on new well

in #hive-1104903 years ago

▶️ Watch on 3Speak


While we are still flushing the newly built well, and still needed to do yield tests, we decided that we would extend a pipe from the well to the dam which is losing water quite fast now. this way whatever water comes out will run into the dam, giving whatever fish have survived this far a small chance at survival. The yield test we are doing is simple, we need to calculate the amount of water pumped as well as the average duration of pump untill the well is dry. this will give us an indication of how long we will be able to pump the well for each day, how long the recovery time is, and how much water we will be getting more or less every time we pump...


▶️ 3Speak